Nueva Panquehue Substation

scrolldown

Type

Industry and Energy

Local

Chile

State

Finished

Year

2019

Client

Eiffage Energía

Nueva Panquehue Substation

QUADRANTE was responsible for the basic and detailed engineering of the design, supply, construction, testing, and commissioning, as well as all the necessary works for Nueva Panquehue 110/13,8 kV operation. The scope of the work also included the engineering design associated with the sectioned power line 2x110 kV Aconcagua -Esperanza.

QUADRANTE had full responsibility for the Management, Supervision, and Development of the High and Medium Voltage Electricity Project, Ancillary Services, Control, Command, and Protection System, and Civil Engineering Design. It included Architecture, Structures, Earthworks, Drainage, General Ventilation design – HVAC, Water Supply, Sewage and Stormwater, Electrics, and Safety Design.